Performance Checks; Test Equipment Setup; Figure 5-1. Performance Checks Test Setup - ASTRO APX 7000 Basic Service Manual

Table of Contents

Advertisement

Chapter 5 Performance Checks
This chapter covers performance checks used to ensure that the ASTRO APX 7000 radio meets
published specifications. The recommended test equipment listed in the previous section
approaches the accuracy of the manufacturing equipment, with a few exceptions. Accuracy of the
test equipment must be maintained in compliance with the manufacturer's recommended calibration
schedule. Checks should be performed if radio performance degradation is suspected.
5.1

Test Equipment Setup

Supply voltage can be connected from the battery eliminator. The equipment required for the
performance checks is connected as shown in
UNIVERSAL
ELIMINATOR
DC POWER SUPPLY
66009254001
(7.5V AT BATTERY
ELIMINATOR
TERMINALS)
5880384G68
BATTERY
RADIO
USB END IS NOT USED

Figure 5-1. Performance Checks Test Setup

Figure
5-1.
BNC
SMA-BNC
TEST SET
RLN4460_
PROGRAM/TEST CABLE
PMKN4013_
MODULATION ANALYZER
30 dB PAD
TRANSMIT
30 dB PAD
SERVICE MONITOR
RF GENERATOR
RECEIVE
SET TO APPROX. 8mV FOR Tx
AUDIO IN
TX
AUDIO GENERATOR
RX
AC VOLTMETER
MEASURE 3.74Vrms FOR Rx
OR
SERVICE MONITOR
AEROFLEX
SINAD METER

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apx 7000xe

Table of Contents