Pressure Equalizing Control - Daikin FTX50GV1B Service Manual

Hide thumbs Also See for FTX50GV1B:
Table of Contents

Advertisement

Control Specification
3.11.1 Fully Closing with Power ON
The electronic expansion valve is initialized when turning on the power. The opening position is
set and the pressure is equalized.

3.11.2 Pressure Equalizing Control

When the compressor is stopped, the pressure equalizing control is activated. The electronic
expansion valve opens and the pressure is equalized.
3.11.3 Opening Limit Control
The maximum and minimum opening of the electronic expansion valve are limited.
Maximum opening (pulse)
Minimum opening (pulse)
The electronic expansion valve is fully closed when cooling operation stops, and is opened at a
fixed degree during defrosting.
3.11.4 Starting Operation Control
The electronic expansion valve opening is controlled when the operation starts, thus preventing
superheating or liquid compression.
3.11.5 Control when the Frequency Changes
When the target discharge pipe temperature control is active, if the target frequency changes to
a specified value in a certain time period, the target discharge pipe temperature control is
canceled and the target opening of the electronic expansion valve is changed according to the
frequency shift.
3.11.6 High Discharge Pipe Temperature Control
When the compressor is operating, if the discharge pipe temperature exceeds a certain value,
the electronic expansion valve opens and the refrigerant runs to the low pressure side. This
procedure lowers the discharge pipe temperature.
41
50/60 class
71 class
480
450
54
75
SiBE041029EB
Function and Control

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents