PRE-COMMISSIONING CHECKS -
APPLIANCE
14:24
Page 30
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25
PRE-COMMISSIONING CHECKS -
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
1 Check that the service and water pipes are
connected correctly.
Check that all unused sockets are capped.
2
Check that the oil supply is kerosene and
that the pipework is connected correctly to
the oil pump via the supplied flexible oil
hose.
Turn on the main oil supply valve at the
tank, check the oil supply pipework and
connections. Rectify any leaks.
3
Check the flue is correctly fitted and the
connections are secure.
4
Check the condensate pipework is
correctly fitted and connected.
Check the condensate trap is filled with
water.
IMPORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close
the water valves, shut off the oil supply
and electrically isolate the boiler.
Complete the installation part of the
Guarantee Registration Card, and
complete a CD10 or equivalent to
inform the LABC of the installation.
8 716 106 256C (03/2010)