Installation Information - Panasonic CS-C73KE Service Manual

Table of Contents

Advertisement

CS-C73KE

Installation Information

Indoor / Outdoor unit installation diagram
Length of power supply cord
about 1.1 m
< <
CU-C123KE
10 cm
or more
• This illustration is for explanation purposes only.
The indoor unit will actually face a different way.
Piping direction
about 1.8 m
Right
Right
<
<
rear
Right bottom
5 cm or
more
Air purifying filter 5
(Left and right are identical)
Insulation of piping connection
Carry out insallation
after checking for gas
leaks.
After securing with
three of the vinyl
tape 7, wrap with
vinyl tape 8.
Saddle (*)
Connecting cable
(3-CORE WIRE/1.5 mm
Locally approved cable.
Additional drain hose (*)
1/4" Liquid side piping (*)
Gas side piping (*)
1/2"
(Front side)
Left
Left
rear
Left bottom
Installation plate 1
Sleeve (*)
Bushing-Sleeve (*)
Vinyl tape
8
Vinyl tape 7
CU-C73KE
CU-C93KE
2
)
10 cm
or more
– 25 –
Attention not to bend up drain hose
Installation parts you must
purchase (*)
Putty, (Gum Type Sealer) (*)
Bend the pipe as closely on the
wall as possible, but be careful
that it doesn't break.
Vinyl tape (Wide) (*)
• Apply after carrying out a
drainage test.
• To carry out the drainage
test, remove into the air filters
and pour water into the heat
exchanger.
Saddle (*)
Connecting cable
(3-CORE WIRE/1.5 mm
Locally approved cable.
Additional drain hose (*)
1/4" Liquid side piping (*)
Gas side piping (*)
3/8"
Vinyl tape (*)
(Narrow)
2
)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-c93kecs-c123keCu-c73kecs-c93keCu-c123ke

Table of Contents