Installation Information; Check Points - Panasonic CU-2E18NBU Service Manual

Outdoor unit
Table of Contents

Advertisement

9. Installation Information

9.1

Check Points

QUICK GUIDE PIPING AND ELECTRICAL SPECIFICATION
Indoor (ID) &
Outdoor (OD)
Capacity
Refrige-
units: Possible
(Btu/h)
Combination
Patterns
Outdoor (OD):
CU-2E18NBU
Indoor (ID): 2
UNITS OF CS-
E9NKUAW
Outdoor (OD):
CU-2E18NBU
Indoor (ID): 2
UNITS OF CS-
16700
R410A
E12NKUAW
Outdoor (OD):
CU-2E18NBU
Indoor (ID): 1
UNIT OF CS-
E9NKUAW +
1 UNIT OF
CS-E12NKUAW
Example:
If total piping length of all installed indoor units is at 68.6 ft, the quantity of additional refrigerant should be 0.6 oz ......
(68.6 - 65.6) ft x 0.2 oz/ft = 0.6 oz.
Piping size
rant
Gas
Liquid
Ø3/8"
Ø1/4"
(Ø9.52mm)
(Ø6.35mm)
Min.
Max.
pipe
Standard
Max.
from
length
pipe
Eleva-
OD to
for
length
tion
each
each ID
ID unit
unit
See
24.6 ft
9.8 ft 82.0 ft 164.0 ft 65.6 ft
Step 1
15
Min. total
Addi-
pipe
Max.
tional
Power
length
total
refri-
supply
for
length
ge-
additional
rant
gas
208/230V
60 Hz
0.2
MCA 20A
oz / ft
MOP
25A
Power
OD-ID
supply
connection
wire
wire size
size
AWG12 AWFG16

Advertisement

Table of Contents
loading

Table of Contents