10. Installation Information

10.1 CU-2Z35TBE CU-2Z41TBE

10.1.1
Check Points
Outdoor unit power supply:
Single-phase 230V, 50Hz
16A switch
(circuit breaker)
(Not included in the unit)
2
1.5 mm
or more x 3 core
(Not included in the unit)
Outdoor wiring work
Drain work
Drain elbow
(Inner diameter: 16mm) provided
10.1.2
The Shapes of the 3-Way Valve Caps of the Outdoor Unit Have Been Changed
Accompanying the changes in the shapes of the 3-way valve caps, the tightening method has also been changed.
Firmly tighten the 3-way valve caps by hand, and then tighten them up by another 30 degrees or so (one-twelfth
of a full turn) using a spanner or adjustable spanner.
connection cables
(Not included in the unit)
Unit B
1.5mm
(polychloroprene sheathed)
(Not included in the unit)
Unit A
Applicable connecting tube kit:
CZ-3F type
Unit A Maximum pipe length: 20 m
Unit B Maximum pipe length: 20 m
Total maximum pipe length: 30 m
Grounding work
After having firmly tightened the caps by hand,
tighten them up further using a
spanner or adjustable spanner.
Caution:
Do not use all your strength to tighten up
the caps. Doing so may break the caps.
31
Panasoni c
2
flexible cord x 4 core
Panasoni c
Air purging: Air purging by vacuum pump.
elevation:
10m max
.
elevation between
each of the indoor
units and between
the indoor and
outdoor units.