Sequence Of Cutting Operation - Miller Spectrum 375 Owner's Manual

Hide thumbs Also See for Spectrum 375:
Table of Contents

Advertisement

5-5. Sequence Of Cutting Operation

Connect work clamp to a clean, paint-free
location on workpiece, as close to cutting
area as possible.
!
The pilot arc starts immediately
when trigger is pressed.
Raise trigger lock and press
trigger. Pilot arc starts.
Adjust torch speed so
sparks go thru metal and
out bottom of cut.
.
A complete Parts List is available at www.MillerWelds.com
Pause briefly at end of
cut before releasing trigger.
°
90
For standard (shielded) cutting, place drag shield on edge
of metal. For extended (non-shielded) cutting, use 1/8 in.
(3.2 mm) standoff distance (dragging tip will reduce tip life).
After cutting arc starts, slowly
start moving torch across metal.
Postflow continues for approx. 20 seconds
after releasing trigger; cutting arc can be
instantly restarted during postflow by raising
trigger lock and pressing trigger.
Ref. 254 087-A
OM-255 590 Page 21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xt30c

Table of Contents