H3C S5120-SI Series Installation Manual page 24

Hide thumbs Also See for S5120-SI Series:
Table of Contents

Advertisement

Figure 3-9 Connect the PGND cable to the grounding hole of switch
(1) Rear panel of the switch
(3) Grounding hole
(5) PGND cable
To attach the other end of the PGND cable to the grounding strip in the equipment room, follow these
steps:
Step1 Cut the PGND cable to a proper length according to the distance between the switch and the grounding
strip.
Step2 Peel 5 mm (0.20 in.) of insulation sheath using a wire stripper, and then insert the naked metal part
through the insulation covering into the end of the OT terminal.
Step3 Secure the metal part of the cable to the OT terminal with a crimper, and then cover it with the insulation
covering. Then heat the insulation covering with a blowing machine to let it completely cover the metal
part.
Step4 Connect the OT terminal to the grounding pole of the grounding strip, and then fasten it with a hex nut.
Figure 3-10 Connect the PGND cable to the grounding strip
(1) Grounding post
(3) PGND cable
(2) Grounding sign
(4) OT terminal
(6) Grounding screw
(2) Grounding strip
(4) Hex nut
3-7

Advertisement

Table of Contents
loading

Table of Contents