WarmFlow BoilerhouseB70HE User Manual page 69

High efficiency condensing boilers
Table of Contents

Advertisement

ST
CONNECT 1
EXTENSION AND AIR HOSE
4. Lubricate then fit the 1
5. Fit the air inlet spigot and gasket to the burner. Attach the flexible air hose to
the burner and starter assembly and secure with the jubilee clips.
st
extension and secure with the locking band.
Page 67
CONNECT TO CLOSURE PLATE
Install the chimney components and
closure plate as instructed in the
separate instruction leaflet.
Run the flue from the boiler to the
chimney closure plate. If necessary, the
extension(s) can be cut to length.
Horizontal entry kits only
Ensure that the „horizontal‟ section into
the closure plate is inclined back
towards the boiler at a minimum of 3° to
the horizontal as shown.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents