Step 3. Position and Level the Rack

If the customer plans to secure the rack to the floor, see Appendix D, "Securing the Rack", on page 41.
To adjust the leveling feet on the rack, do the following:
1. Ensure the rack is positioned according to the customer plan.
2. Loosen the jam nut on each leveling foot by turning the nut counterclockwise (away from the bottom of
the rack).
3. Rotate each leveling foot downward until it contacts the surface on which the rack is placed.
4. Adjust the leveling feet downward as needed until the rack is level. When the rack is level, tighten the
jam nuts against the base by turning the nut clockwise (toward the bottom of the rack).
1
2
3
1
2
3
10
Eserver pSeries 670 Installation Guide
Jam Nut
Leveling Foot
Rack Base (Front)