Winnebago Sunflyer Owner's Manual page 48

Hide thumbs Also See for Sunflyer:
Table of Contents

Advertisement

SECTION 2
DRIVING YOUR MOTOR HOME
the house batteries, or a burned out fuse on the
chassis fuse block. (See "Troubleshooting" on
page 2-21.)
NOTE: Check fuses #16 Step Alarm and #24 Ra-
dio/Acc. There is also a fuse on the back
of the HWH leveling system control pad,
which must be unfastened from the driver
door to inspect.
If an apparent cause is not found, call the
number on your Winnebago Industries Premium
Roadside Assistance card. They will dispatch a
service vehicle to your location to push the room
extension in so the coach may be driven to your
dealer for service of the slideout control system.
NOTE: The following information may be needed
by the service operator to prepare the
bedroom slideout for the "push-in" pro-
cedure.
Bedroom Slideout
Emergency 'Push-In" Procedure
Open the "slideout" hydraulic line valves on
the pump to relieve hydraulic line pressure.
(See Step 1 under "Slide-Out Room Emer-
gency Crank-In" on previous page.)
DO NOT OPEN THE JACK VALVES ON
THE RESERVOIR SIDE OF THE PUMP.
These regulate the coach leveling jacks.
Apply a steady inward pressure of approxi-
mately 150 lbs. to the exterior sidewall of the
slideout room to push the room in toward the
coach until it is snug against the main coach
sidewall.
NOTE: Use some type of rigid, padded mate-
rial to protect the sidewall from punctures,
dents or other damage to the finish from any
device or equipment used to press the side-
wall in.
Pressure must be applied evenly to avoid
binding of the hydraulic mechanism. It may
take about 10 minutes to press the room
extension inward completely.
When the room is snug against the coach
wall, close the solenoid valves to prevent
"creep out" during transit.
2-24
See an authorized Winnebago Industries
dealer for service of the slideout control sys-
tem.

Advertisement

Table of Contents
loading

Table of Contents