IBM eServer 232 xSeries Installation Manual page 30

Hide thumbs Also See for eServer 232 xSeries:
Table of Contents

Advertisement

Power supply handle
(in open position)
To install a hot-swap power supply:
1. Make sure the server has the power supply backplane option installed.
2. Remove the filler panel from the empty power supply bay.
3. Install the power supply in the bay:
4. Plug the power cord for the added power supply into the power cord connector.
5. Route the power cord through the cable-restraint bracket.
6. Plug the power cord into a properly grounded electrical outlet.
7. Verify that the dc power light and ac power light on the power supply are lit,
8. If you have other options to install, install them now.
9. If you removed the server cover, reinstall it.
10. Continue with "Cabling the server" on page 19.
18
IBM xSeries 232: Installation Guide
Filler panel
Power supply
Note: During typical operation, each power-supply bay must have either a power
supply or filler panel installed for proper cooling.
indicating that the power supply is operating correctly.
Power supply
backplane option
Cable-restraint
bracket

Advertisement

Table of Contents
loading

Table of Contents