Improper installation, adjustment, alteration,
!
service or maintenance could result in
personal injury or loss of life.

Installation

Installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME CSD-1.
In Canada installations must be in accordance with CSA
B139. In absence of such codes, installation must conform
to the requirements of authority having jurisdiction. Such
applicable requirements take precedence over general
instructions of this manual.
Locate boiler in front of final position before removing
crate. Provide level solid base as near to vent outlet
as possible and centrally located with respect to heat
distribution system as practical.
Allow 24 inches in front and top for servicing and cleaning,
or removing tankless water heating coil.
When installed in utility room, door should be wide enough
to allow largest boiler part to enter, or permit replacement
of another appliance such as water heater.
Installation on Combustible Floors
Boiler shall not be installed directly on carpeting, tile or
other combustible material other than wood flooring. Boiler
must not be installed on carpeting or vinyl flooring.
WARNING
INStALLAtION
Minimum clearances to combustible construction are:
TOP .............................................. 0.0 IN.
FRONT ..................................... 24.0 IN.*
FLUE CONNECTOR .......................... 2.0 IN.
REAR ............................................ 0.0 IN.
LEFT SIDE ..................................... 0.0 IN.
RIGHT SIDE ................................... 0.0 IN.
* "FOR ALCOVE INSTALLATION"
Recommended clearance for service access should exceed
fire protection clearance.
TOP ............................................... 24 IN.
FRONT ........................................... 24 IN.
FLUE CONNECTOR .............................9 IN.
REAR ...............................................6 IN.
LEFT SIDE ...................................... 10 IN.
RIGHT SIDE ......................................6 IN.
Remove crate and plastic protective wrapper and inspect
for damage.
Our responsibility ceases upon delivery of the crated boiler
to the carrier in good condition. Any claims for damage or
shortage in shipment must be filed immediately against
carrier by consignee. Move boiler to permanent position by
sliding or walking.
4