Setting In Operation - Installation; Power Supply - Bodet Opalys Date Installation And Operating Instructions Manual

Hide thumbs Also See for Opalys Date:
Table of Contents

Advertisement

Available languages

Available languages

III - SETTING IN OPERATION - INSTALLATION

3.1 Power supply

Attention
: Opalys clock has to be powered in TBTS (very low tension) through the power
supply unit delivered.
Fig. 2
Setting of the table bracket (if supplied)
(in the 2 notches of the wall bracket).
a.
Turn the clock over onto a table (see fig.2).
Unscrew the anti-theft locking screw.
Push in front of the 2 arrows on the wall bracket to
unclip it.
Remove the wall bracket / connector cover on the
back of the clock.
b.
Connect the mains to the power supply unit.
Remark: the power supply unit can be placed in an
embedded box in compliance with the safety
instructions page 28.
161
100
Anti-theft locking screw.
Reset
Sel.
°
C
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Opalys Date and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents