Appendix A. Rack Installation Instructions - IBM Netfinity 5100 User Reference Manual

Hide thumbs Also See for Netfinity 5100:
Table of Contents

Advertisement

3
A
Use the pins
on the slide rail to align the
A
slide rail to the rack. Use the M6 screws to
bolt the slide rail to the rack (left front of rack
shown here). Repeat this step for the other
slide rail.
5
A
Fully extend the slide rails out of the rack. Lift
the server above the rails; then, rest the rack-
support wheels
located on the rear of the
A
server on the slide rails. Lower the front of the
server onto the slide rails.
Note:
Be sure the bracket notches
front of the server fit securely on the tabs
located on the front of the slide rails.
B
C
on the
B
C
4
B
Use the M6 screws to attach the hinge bracket
to the rear of the rack. Then, use the hinge
A
pins
to attach the cable-management
B
assembly to the rack and to the slide rail
(right rear of rack shown here).
6
A
Use the M4 screws to secure the server to the
rails. Remove the rack-support wheels
store them in a safe place.

Appendix A. Rack Installation Instructions

Installing in a rack
A
and
A
179

Advertisement

Table of Contents
loading

Table of Contents