Takagi T-H2-DV Installation Manual And Owner's Manual page 18

On-demand condensing water heater
Hide thumbs Also See for T-H2-DV:
Table of Contents

Advertisement

4.
Re open the manual gas valve. Check to see that there are no gas leaks. Open some of the fixtures
that use the highest flow rate to turn on the T H2 DV/T H2 OS.
5.
Check the inlet gas pressure. When T H2 DV/T H2 OS is on maximum burn, the manometer should
read from 5.0" to 10.5" WC for Natural gas, from 8.0" to 14.0" WC for Liquid Propane.
Size the gas pipe appropriately to supply the necessary volume of gas required for the
T H2 DV/T H2 OS (199,000 BTU/h for both Natural Gas and Liquid Propane) using
ANSI233.1/NFPA 54 in the USA or CAN/CSA B149.1 in Canada or local codes.
Otherwise, flow capabilities and output temperatures will be limited.
1.
Install a manual gas shut off valve between the T H2 DV/T H2 OS and the gas supply line.
2.
When the gas connections are completed, it is necessary to perform a gas leak test either by
applying soapy water to all gas fittings and observing for bubbles or by using a gas leak detection
device.
3.
Always purge the gas line of any debris and/or water before connecting to the gas inlet.
Maximum Delivery Capacity of Cubic Feet of Gas per Hour of IPS Pipe Carrying Natural Gas of 0.60 Specific Gravity
Based on Pressure Drop of 0.5" WC
Based on Energy Content of 1000 BTU/Cubic Ft.: T H2 DV/T H2 OS requires 199 Cubic Ft./hr.
Pipe Size
Inches
10'
20'
¾"
363
249
1"
684
470
1 ¼"
1,404
965
1 ½"
2,103 1,445 1,161
2"
4,050 2,784 2,235 1,913 1,696 1,536 1,413 1,315 1,234 1,165 1,033
Maximum Capacity of Propane (LP) Gas Based on 11" WC supply pressure at a 0.5" WC pressure drop
Pipe Size
Inches
10'
20'
¾"
567
393
1"
1,071
732
1 ¼"
2,205 1,496 1,212 1,039
1 ½"
3,307 2,299 1,858 1,559 1,417 1,275 1,181 1,086 1,023
2"
6,221 4,331 3,465 2,992 2,646 2,394 2,205 2,047 1,921 1,811 1,606 1,496
For more information, please see the next page.
Natural Gas Supply Piping
30'
40'
50'
200
171
152
377
323
286
775
663
588
993
880
Propane (LP) Gas Supply Piping
30'
40'
50'
315
267
237
590
504
448
913
18
Length in Feet
60'
70'
80'
138
127
118
259
239
222
532
490
456
798
734
683
Length in Feet
60'
70'
80'
217
196
185
409
378
346
834
771
724
Page
Installation
Unit: Cubic Feet per Hour
90'
100'
125'
111
104
93
208
197
174
428
404
358
641
605
536
Unit: kBTU per Hour
90'
100'
125'
150'
173
162
146
322
307
275
677
630
567
976
866
150'
200'
84
72
158
135
324
278
486
416
936
801
200'
132
112
252
213
511
440
787
675
1,260

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-h2-os

Table of Contents