3-17. LOCK SW BOARD, LOADING SW BOARD
Note for installation
When installing the
LOADING SW board and
LOCK SW boards,
align the leads position as shown.
LOADING SW board
LOCK SW board
2 screw
(BVTP3 × 8)
9 LOCK SW
claws
leads
position
1 Rotate the pulley (400) in the
direction of the arrow A fully.
3 Rotate the pulley (400) in the
direction of the arrow B fully.
A
B
8 screw
(BVTP3 × 8)
board
DVP-CX995V
7 gear (center)
5 screw (BVTP3 × 12)
4 belt (400)
6 pulley (400)
0 screw
(BVTP2.6)
qa LOADING SW
board
19