DVP-CX777ES
3-17. LOCK SW BOARD, LOADING SW BOARD
Note for installation
When installing the
loading SW board and
lock SW boards,
align the leads position as shown.
lock SW board
20
2 screw
(BVTP3 × 8)
loading SW board
claws
leads
position
1 Rotate the pulley (400) in the
direction of the arrow A fully.
3 Rotate the pulley (400) in the
direction of the arrow B fully.
A
B
8 screw
(BVTP 3 × 8)
9 lock SW
board
7 gear (center)
5 tapping screw
4 belt
6 pulley (400)
0 screw
(BVTP 2.6 × 8)
qa loading SW
board