Product Mounting Diagram; Preparing For Operation - Chauvet Atmos Quick Reference Manual

Hide thumbs Also See for Atmos:
Table of Contents

Advertisement

Available languages

Available languages

Atmos™ QRG
Mounting
Product
Mounting
Diagram
Control Panel
Description
Preparing for
Operation
Before mounting this product, read the
is capable of supporting the weight of the product. For our Chauvet line of mounting
clamps, go to trusst.com/productcategory/base-plates-accessories-clamps/.
Secure the safety cable using
Secure the safety cable using
the safety loops on the
the safety loops on the
Mounting Clamp
Button
<FUNCTION>
Enters the programming mode
<VOLUME>
Controls the pump to modify the output volume
<TIMER>
Starts the timer controlled operation
Allows momentary fog output for as long as the button is
<MANUAL>
held down
Navigates upward through the menu list or increases the
<UP>
numeric value when in a function
Navigates downward through the menu list or decreases the
<DOWN>
numeric value when in a function
To prepare the Atmos™ for operation:
1. Pull out the fluid tank and remove the cap.
2. Verify that the two plastic hoses attached to the cap are in place and in good
condition.
3. Pour Chauvet (HDF or QDF) fluid inside the tank and re-cap.
4. Reinsert the tank.
5. Make sure that the plastic hose that goes from the cap to the Atmos™ is not
bent.
6. Plug in power and wait approximately 8 minutes for warm-up to complete.
Safety
Notes. Make sure the mounting clamp
product.
product
Overhead Mounting
Floor Mounting
Function
4
EN
Safety Cable

Advertisement

Table of Contents
loading

Table of Contents