Panasonic CS-A7BKP Service Manual page 53

Table of Contents

Advertisement

CS-A7BKP CU-A7BKP5 / CS-A7BKP CU-A7BKP6 / CS-A9BKP CU-A9BKP5 / CS-A9BKP CU-A9BKP6 / CS-A12BKP CU-A12BKP5 / CS-A12BKP CU-A12BKP6
11.1.4. Balance refrigerant of the 2-way, 3-way valves
(Lack of refrigerant in the refrigeration cycle)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to
the open position.
2. Connect the charge set to the 3-way valve's service
port.
• Leave the valve on the charge set closed.
• Connect the charge hose with the push-pin to the
service port.
3. Connect the charge set's centre hose to refrigerant
reclaiming equipment.
• Purge the air from charge hose.
4. Open the valve (Low side) on the charge set and
discharge the refrigerant until the gauge indicates 0.05
2
MPa (0.5 kg/cm
G) to 0.1 MPa (1 kg/cm
• If there is no air in the refrigeration cycle (the pressure
when the air conditioner is not running is higher than 0.1
2
MPa (1 kg/cm
G), discharge the refrigerant until the
gauge indicates 0.05 MPa (0.5 km/cm
2
kg/cm
G). If this is the case, it will not be necessary to
apply a evacuation.
• Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration oil will also be
discharged.
5. Turn on refrigerant reclaiming equipment.
2
G).
2
G) to 0.1 MPa (1
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents