Download Print this page

Quadra-Fire VOYA-GRAND-MBK Owner's Manual page 36

Hide thumbs Also See for VOYA-GRAND-MBK:

Advertisement

.
e
e
ir u
his insert conforms with the safety standard L-14 2 and
F.
re
ri
e
e
he chimney can be new or e isting, masonry or prefabricated
and must meet the following minimum re uirements:
or LC S62 .
installation.
for installation.
approved for installation into listed factory-built solid
fuel
cap must be re-installed after installing the approved
chimney liner meeting type
collar and the chimney top.
air-cooled chimney system.
1.
f this cannot be accomplished, it will be necessary
to remove the damper.
2. Seal damper area of chimney around chimney
connector with a high temperature sealant or seal
3. oth methods must be removable and replaceable
for cleaning and re-installation.
Page 36
er
i g
r
i
e
L 103
re uirements
Minimum Width of Cavity Opening - Front
Minimum Width of Cavity Opening - Rear
Minimum Height
-
Minimum Depth from Front to Rear
e er
e
i
replaces without a permit will void the listing.
o
NOTICE: n Canada when using a factory-built chimney it must
be safety listed,
or conforming to
F
ire Risk.
When lining air-cooled factory-built chimneys:.
-
system you may use a Simpson Dura- ent DuraLiner
Slip
anger, Part
options to completing the installation.
i
e
Re-attach the e isting top of the chimney cap.
i
Re-attach the e isting top of the chimney cap and install a
new storm collar and a new liner cap.
WARNING! Risk of Fire!
7075-166C
Inches
32-7/
24
24
1
i
e
i er
u
u
r i g
e i er.
e
3
2
F
2
.
4671, and attach to the bottom of the
re uire
u e i er
i g i er
May 23, 2013
R
Millimeters
35
610
610
457
-
urer
r re
i
i
F
:

Advertisement

loading

This manual is also suitable for:

Voya-grand-pmh