Adjusting Engine Speed (Deutz F4L2011-Powered Units) - Miller Electric Big Blue 402D Owner's Manual

Miller electric owner's manual welding engine driven welding generator big blue 402d, big blue 502d, big blue 602dr
Table of Contents

Advertisement

9-5. Adjusting Engine Speed (Deutz F4L2011-Powered Units)

Tools Needed:
3/8, 7/16 in
Standard Models
2
1
Models With Automatic Idle (Optional)
4
3
5
6
Return To Table Of Contents
Y Stop engine and let cool.
Engine speed is factory set and
should not require adjustment. Af-
ter tuning engine, check engine no
load speed with a tachometer or fre-
quency meter (see table for no load
speeds). If necessary, adjust speed
as follows:
Start engine and run until warm.
On CC Models, place Stick/TIG
switch in Stick position.
On CC/CV models, turn Process/
Contactor switch to Stick − Elec-
trode Hot position.
Standard Models:
1
Engine Speed Adjustment
1850 rpm Max.
Screw
(61.6 Hz)
2
Locking Nut
1250 rpm
(41.5 Hz)
Loosen nut. Turn screw until engine
runs at weld/power speed. Tighten
nut.
.
Do not set engine speed higher
than specified.
Models With Automatic Idle
(Optional)
3
Throttle Rod
4
Locknut
Loosen locknuts. Place engine
control switch in Run/Idle position.
Turn throttle rod until engine runs at
idle speed. Tighten locknuts.
5
Engine Speed Adjustment
Screw
6
Locknut
Place engine control switch in Run
position.
Loosen locknut. Turn screw until
engine runs at weld/power speed.
Tighten locknut.
.
Do not set engine speed higher
than specified.
Y Stop engine.
Close door.
802 313-A
OM-495 Page 51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Big blue 502dBig blue 602dr

Table of Contents