3. PREPARATION OF THE SITE

The machine is delivered in a cardboard box screwed onto a wooden pallet.

Unpack the machine

- Cut the tightening strap with shears.
- Open the cardboard box and take the accessories' container out.
- Undo the screws by slightly inclining the cardboard box.
- Take the machine out of the cardboard box and put it on wooden blocks.
- Remove screws and washers used for transport.

Install the machine and preparation of the site

- Put the machine in its final place and level it up with the help of rubber washers, as necessary.
- The machine must be placed on a horizontal surface.
- There must be a free space of 5 cm behind the machine and the ventilation holes on the top of
the machine must not be obstructed.
- A socket with a ground system and a water-supply pipe corresponding to the characteristics of
the machine are sufficient for connecting.
- Set up cup racks after making adjustments.
- The machine is not to be operated without its legs.

4. HYDRAULIC CONNECTION

A water softener is necessary over 5°KH.
Water Intake
- Pressure ranging from 0 to 10 bar
- Connection : 3/8 gas female socket (male plug on
machine)
- Pipe with a minimum 8 mm internal diameter
- Stop valve to be set up.
Drainage
- Connection : 3/4 gas female socket (male plug on
machine)
- Pipe with a minimum 12 mm internal diameter.
5