Baxi Combi 130 HE Installation & Servicing Instructions Manual page 21

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Facia Securing
Screws
Facia Box
FLUE PRODUCTS EXHAUST
Fig. 19
Flow Regulator
Water Inlet Filter
Tap Rail
Hot Water
Outlet
Cold Water
Inlet
Gas Connection
Central
Central
Heating Flow
Heating Return Pressure Relief
Tap Rail
Fig. 18
Fig. 20
Fibre Sealing
Washer
8.0 Installation
Top Hooks
8.4
1. Remove the tape from the tap rail on the
support bracket.
2. Lift the boiler using the lower edges of the
combustion box.
3. Lift the boiler over the support bracket and
engage onto the top hooks.
4. To gain access to the connections between
boiler and valves, release the facia securing
screws (
5. Make the connections in the following
sequence:
a) Gas connection first to centralise the boiler. The
gas sealing washer is an integral part of the
gas tap.
The Combi 130 HE is designed to operate
under nominal water supply conditions. If the
hot water delivery is greater than 18
litres/minute the flow regulator must be fitted to
the Domestic Hot Water inlet (A pint milk bottle
Support Bracket
must fill in under 2 seconds).
b) Domestic hot water cold feed, if necessary fit
the water flow regulator ensuring that it is fitted the
correct way round (Fig. 20). NOTE: Ensure water
inlet filter is fitted.
c) The remaining connections ensuring the fibre
sealing washers are inserted between the valve
outlet face and the flange on the copper pipes of
the water circuit and pressure relief connections
(Fig. 20).
6. Tighten the connections in the sequence listed
above.
8.5
1. Connect the condensate drain using the 1" BSP
nut and seal supplied.
Ensure the discharge of condensate complies
with any national or local regulations in force (see
British Gas " Guidance Notes for the Installation
of Domestic Gas Condensing Boilers".
2. The condensate outlet terminates in a 1" BSP
nut and seal for the connection of 21.5mm (
plastic overflow pipe (See section 7.6 for details
of recommended condensate drain methods).
Central Heating
Return Filter
Fitting The Boiler (Fig. 18)
1
/
turn) and hinge down the facia box.
4
Condensate Drain (see section 7.6)
3
/
in)
4
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents