Test Operation - Carrier 40MB*C Installation Instructions Manual

Cassette ductless split system system sizes 09"" 18 air conditioner
Hide thumbs Also See for 40MB*C:
Table of Contents

Advertisement

!
Close the intake grille, and close the 2 grille hooks.
[
7
TEST OPERATION
Make sure the control box lids are closed on the indoor and outdoor
units.
Refer to "For the following
items, take special care during construction
and check after installation
is finished"
on page 2.
After finishing the construction
of refrigerant
piping, drain piping, and
electric wiring, conduct test operation accordingly
to protect the unit.
Test operation
after installing
decoration panel
1 Open the gas side stop valve.
2
Open the liquid side stop valve.
3
Electrify crank case heater for 6 hours.
4
Set to cooling operation with the remote controller
and start
operation
by pushing ON/OFF button.
5
Check the following
points. If there is any malfunction,
please
resolve it according
to the chapter "Troubleshooting"
in the
"Owner's
Manual".
m The indoor unit
- Whetherthe switchon the remotecontrollerworks well.
- Whetherthe buttonson the remote controllerworks well.
- Whetherthe airflow louver movesnormally.
- Whetherthe room temperatureis adjustedwell.
- Whetherthe indicatorlights normally.
- Whetherthe temporarybuttonswork well.
- Whetherthere is vibrationor abnormal noise during operation.
Whetherthe drainage flows smoothly.
m The outdoorunit
- Whetherthere is vibrationor abnormal noiseduring operation.
- Whetherthe generatedwind, noise,or condensed of by the air
conditioner negativly impactthe neighborhood.
- Whetherany of the refrigerant is leaked.
6 Turn off the main power supply after operation.
,a,
A protection feature prevents the air conditioner
from being
activated for approximately
3 minutes when it is restarted
immediately
after shut off.
18

Advertisement

Table of Contents
loading

Table of Contents