Mitsubishi Electric PURY-P200YLM-A(1) Service Handbook page 386

Table of Contents

Advertisement

[8-14 Solenoid Valve Block and Check Valve Replacement Instructions ]
2) Remove the control box.
1) Remove the upper
and lower service
panels (Panel FU
and FB).
Debrazing pipe
6
Remove the
pipe from the
brazed G.
G
(ø15.88)
Removing or installing
2 8
Solenoid valve block
Solenoid
valve block
Screw
Supporting plate for
(M5)
Solenoid valve block
* Refer to the next page for Check valve (CV4a, CV6a, CV8a) replacement procedures.
HWE1314A
1 10
Coil cover, Solenoid valve coil
(SV4a,SV4b,SV4d)
D
3
9
(ø12.7)
3) Remove the cable that is fixed to
A
3
9
C
3
9
(ø19.05)
(ø12.7)
Heat
B
3
9
exchanger
(ø15.88)
- 375 -
the Frame M ASSY
and remove the Frame M ASSY.
Brazing or debrazing pipes
3
9
F (ø28.6)
E (ø15.88)
*This figure does not show heat exchanger.
Removing Solenoid valve block
4
ASSY
C
F
D
E
Removed Solenoid
valve block ASSY
Removing or fixing the Supporting
5
7
plate for Solenoid valve block
Solenoid
valve block
Screw (M5)
Supporting plate
for Solenoid
valve block
A
B
GB

Advertisement

Table of Contents
loading

Table of Contents