Putting The Machine Into Service - Maytag MFS 50-125 Installation And Maintenance Instructions Manual

Industrial washer extractors
Table of Contents

Advertisement

and pass it in the appropriate opening in the machine. Connect these signal terminals like the manufacturer
of the liquid soap system requires. The liquid soap system may draw maximum 0,1A out the control circuit
of the washer-extractor.
WATER RECYCLED DRAINAGE CONNECTION
Valid only for machines equipped with recycled drainage by the manufacturer or for machines after modification.
Attach connecting hoses to the discharging valve of 76 mm / 3" diameter, located on the right side (from rear
view). The hoses go to your recycling tank located below the drainage valve. The tank must be dimensioned
for a total weight of given water volume and made up of materials which resist the temperature of 80°C / 176°F
and washing soaps effects. The quantity of water for one machine and a washing cycle differs according to
applicated programmes and creates an average about 550 - 1500 dm
THE QUANTITY OF WATER DEPENDS ON THE PROGRAMME YOU HAVE CHOSEN AND ON WATER
LEVELS BEING SET UP IN INDIVIDUAL WASHING STEPS.

4.5. PUTTING THE MACHINE INTO SERVICE

Before you put the machine into service, remove the three striking colour transport braces securing the vibrating
machine components during the transport. One brace (fig. 3.11. A, B, pos. 1) is located in the front part
of the machine, accessible after the front lower cover removal. The two braces (2) are placed in the rear machine
part, accessible after the rear cover removal. After you have removed the braces, mount the covers back to
their places.
WARNING !
!
THE TRANSPORT BRACES MUST BE REMOVED PRIOR PUTTING YOUR MACHINE INTO SERVICE.
OTHERWISE YOUR WASHING MACHINE CAN BE SERIOUSLY DAMAGED!
YOU MUST DO:
1. A check of the transport braces removal.
2. Removal of the cabinet protective foil.
3. A check if the waste sump is ready for water drainage.
4. A check of the protective connection (earthing) - „PE" or „PEN".
5. A careful reading of the operation manual before the machine start and following the instructions stated.
6. A check of the drum rotation direction during extracting according to the extracting label (fig.4.5, pos.3)
on 2-motor versions.
7. A check of the vibration switch function during extracting and the emergency function.
8. Initialization for calibration of „zero" level (on the microprocessor version), according to instructions of the
„Programming manual - electronic programmer" delivered with the machine.
22 kg / 50 lbs machine
504 766
PUBLICATION DATE 03/02
Fig.4.5. A Transport braces
INSTALLATION AND MAINTENANCE MANUAL
3
/ 145 - 400 US gallons.
33/40/55 kg - 80/100/125 lbs
machines
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs100pfvsMfs125pfvsMfs80pnfvs

Table of Contents