Ventilation Connection; Electrical Connection - Maytag MDE 1100AES Use And Care Manual

Drying cabinet
Table of Contents

Advertisement

Ventilation connection

If the drying cabinet is installed in a
custom cabinetry, fit the exhaust collar
through the vent opening in the upper
part of the cabinetry when the drying
cabinet is moved to its final location.
1. Place the exhaust collar over the hole in
the drying cabinet's top plate, align the
screw holes and screw the exhaust collar
into place.
2. Connect the vent pipe if the drying cabi-
net is built in, or press the supplied (only
certain markets) flexible hose into place.
See the section 'Ventilation requirements'
on page 9.

Electrical connection

Consult the earlier section 'Electrical require-
ments', on page 8.
The exhaust collar is designed to be
screwed in place with two screws to
the drying cabinet's top plate.There are
predrilled holes in the exhaust collar
and top plate.
1.
1
Exhaust collar
17

Advertisement

Table of Contents
loading

Table of Contents