Supplimentary Technical Information - Worcester GREENSOURCE 6 kW Installation Manual

Heat pump with hot water distribution unit
Hide thumbs Also See for GREENSOURCE 6 kW:
Table of Contents

Advertisement

Technical information
Supplementary technical information
Maximum water supply pressure to the pressure reducing valve
Operating pressure DHW
Expansion vessel charge pressure
Expansion valve setting
Maximum primary working pressure
Set opening pressure of the combined temperature and pressure relief valve
Expansion vessel, 19 Litres
Cylinder reheat times, Inner cylinder 151 Litres of DHW
Full volume heat-up from 15°C to 55°C with a primary fl ow temperature of 60°C takes 2 hours and 15 minutes
Full volume re-heat to 55°C after 70% of the cylinders contents were drawn off takes 1 hour and 50 minutes
Manufacturer
Appliance:
IVT Industrier AB, part of Bosch Thermotechnik GmbH
Box 1012, SE-57343 Tranås, Sweden
Cylinder:
BoRö Pannan AB
Bangårdsv. 1, SE-95231 Kalix, Sweden
Important note
Only genuine Bosch Thermotechnology spare parts can be used with these products.
44
16 bar
3 bar
3 bar
6 bar
2,5 bar
7 bar / 95°C
3 bar