Advanced Menu - Worcester GREENSOURCE 6 kW Installation Manual

Heat pump with hot water distribution unit
Hide thumbs Also See for GREENSOURCE 6 kW:
Table of Contents

Advertisement

Advanced menu

Temperature
Hot water
Temperatures
Defrost settings
Timers
Additional heat settings
Heating system temperature
Room sensor settings (T5)
Time limited settings
Heating season
Heating, maximum operating time at hot water requirement
Shut down protection, change over hot water to heating
Compressor working area settings
Extra hot water
Hot water peak
Hot water temperature
Time control hot water
Hot water additional heat
Shows temperatures, inputs, outputs.
Correct sensor
T12 - T11 settings
Maximum outdoor temperature
T11 Maximum temperature
Maximum time
Delay after compressor start
Minimum time between defrosts
Compressor pressure equalisation time
4-way valve pressure equalisation time
Forced defrost
Heating cable time after defrost
Fan defrost
Shows timers
Start delay
Time control additional heat
Additional heat options
Electric additional heat settings
Mixing valve settings
Connected electrical capacity (shows present value)
29
Menu overview
K
K
K
K
K
I/S
I/S
K
K, I/S
K, I/S
K
I/S
I/S
I/S
I/S
I/S
I/S
I/S
I/S
I/S
I/S
I/S
I/S
K, I/S
I/S
I/S
I/S
I/S
I/S
I/S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensource 7 kwGreensource 9.5 kw

Table of Contents