Symbol Meaning ▶ a step in an action sequence a reference to a related part in the document • a list entry – a list entry (second level) Table 1 Greenstar Condensfit II – 6 720 874 391 (2019/04)
▶ The flue has a fall of 3° (52 millimetres per metre) back to the boiler. ▶ The terminal is not damaged or restricted. ▶ The plume management kit is not damaged (if fitted). Greenstar Condensfit II – 6 720 874 391 (2019/04)
▶ Measure the flue length L from the centre line of the flue turret, along the route of the flue system, to the face of the outside wall. ▶ Select the required number of extensions and elbows to achieve the required flue run. Greenstar Condensfit II – 6 720 874 391 (2019/04)
Page 7
• Greenstar Compact Combi’s and System. • Greenstar Compact Ri. • Greenstar Compact ErP Combi’s and System. • Greenstar Compact ErP Ri 50mm Fig. 10 45° elbow offset from the wall Wall Greenstar Condensfit II – 6 720 874 391 (2019/04)
3 3 0 M i n 300mm Fig. 15 Example horizontal flue through a pitched roof Support bracket Roof flashing Fig. 13 Shortening the terminal assembly Flue joint Greenstar Condensfit II – 6 720 874 391 (2019/04)
Support bracket, supporting approximately every metre for example at flue joint connections and any change of direction. Using 2,000mm extension reduces the connection joints external to building fabric and adds more stability to the flue run. Greenstar Condensfit II – 6 720 874 391 (2019/04)
– Before sliding the inner wall seal [1] against the wall, seal the gap ▶ When drilling fixing points in the outer flue tube, take care not to drill around the fixed flue to secure in position. into the inner tube. Greenstar Condensfit II – 6 720 874 391 (2019/04)
▶ Align the high level horizontal flue adaptor to the appliance flue outlet with the flat [2] facing to the rear of the appliance. Fig. 23 Connection to the flue adaptor examples Greenstar Condensfit II – 6 720 874 391 (2019/04)
Page 12
▶ Drill two holes, 180° apart, through the outer flue tube of the extension and secure with the screws [2] provided. Fig. 24 Elbow connection examples (90° elbow) Fig. 25 Extension and fixed flue connection examples Greenstar Condensfit II – 6 720 874 391 (2019/04)
▶ When redirecting the flue discharge the terminal end must be at least 1,500mm from any opening in the direction of the discharge to prevent combustion products from entering the building as shown Greenstar Condensfit II – 6 720 874 391 (2019/04)
If the 500mm plume management pipe kit is cut, an additional elbow will be required to join the pipe work. ▶ The Plume management extension kit contains the components required for such a configuration. 0010013547-001 Fig. 29 Plume management accessories Greenstar Condensfit II – 6 720 874 391 (2019/04)
10° fall back, (stop tabs in the elbow prevent less than 10°) to the appliance for proper disposal of condensate. ▶ Any further horizontal runs after an elbow can be 3°. Greenstar Condensfit II – 6 720 874 391 (2019/04)
Page 20
▶ Push the 45° elbow [4] fully into the extension tube [2], the stop tabs set the depth and allow for expansion. ▶ Further extensions are fitted in the same way as previously described. ±80° Fig. 48 Plume extension fitting Greenstar Condensfit II – 6 720 874 391 (2019/04)
Page 21
▶ Fold the two pronged gate [2] in and latch onto the guard frame. the screw [1] removed earlier from the outlet assembly elbow. 100 mm Fig. 51 Terminal guard fitting Fig. 50 Fitting extension under balcony/overhang Greenstar Condensfit II – 6 720 874 391 (2019/04)
Direction of the flue products, must be more than 45° from the 8 713 406 039 0 wall or structure. Plume terminal. Table 7 Spare parts list At least 1,500mm from any opening in the building. Greenstar Condensfit II – 6 720 874 391 (2019/04)
Page 23
Inspection and spares Greenstar Condensfit II – 6 720 874 391 (2019/04)