Intel
®
Server System R1000WT Product Family System Integration and Service Guide
Install Air Duct Side Walls and Chassis Support Bracket
The air duct sidewalls and chassis support bracket MUST be installed and fastened down in a specific order.
Do not deviate from the provided instructions.
•
Locate the two black plastic air duct sidewalls.
•
Following the illustration above, place the left and right air duct sidewalls onto each side of the server board (see
letter "C")
•
Using the captive screws on the side walls, loosely secure each to the server board (see numbers 1 & 2).
•
Locate the Chassis Support Bracket
•
Following the illustration above, position the Chassis Support Bracket onto the server board, aligning the two end
mounts with the air duct sidewall mounting holes and the center mount to the mounting hole on the server board.
(see letter "D").
Integration NOTE: When positioning the support bracket, the Front Control Panel cable connected to the server board,
should be routed toward the chassis sidewall allowing the support bracket to fit over the cable. Correctly installed, the
cable will route itself inside the support bracket
•
Locate the three support bracket fastener screws, 2 long and 1 short.
•
Using 8 in-lbs torque, secure the Chassis Support Bracket to the server board in the order specified; outer screws
(#3 & #4) first, followed by the center screw (#5). Note that the center screw (#5) is shorter than the two outer
screws
•
Go back and securely tighten the air duct side wall screws (#1 and #2 in the illustration) using 8 in-lbs torque
•
Attach the Blue 20-pin cable connector of the Front USB Cable (from the previous section) to the matching Blue 20-
pin connector on the server board labeled "FP USB 2.0/3.0". Push the cable down as far as possible into the cable
routing channel.
Install 2nd SAS/SATA Data Cable (For Intel® Server Chassis R1208WTxxx Only)
12
Figure 18. Air Duct Side Wall and Support Bracket Installation
Rev 2.2