Operation Starting Control - Daikin 3MKS50E3V1B Service Manual

Super multi nx e / f / g / k-series
Hide thumbs Also See for 3MKS50E3V1B:
Table of Contents

Advertisement

Indoor Unit Control (RA Models)
1.3

Operation Starting Control

Outline
Wall Mounted Type: FTXG Series
The system carries out the following control at the beginning to conduct every functional parts
properly.
1. Opening the front panel fully
2. Output of the ∆D signal after the front panel starts moving
3. Opening the flap fully after the front panel opens fully
4. Making the fan rotate when the flap passes over the fan-banned area
Control Flow
Timing Chart
78
(1)
Opening the front panel fully
(3)
Opening the flap fully
OFF
Fully close
Front
panel
Fully open
Fully open
Flap
Fan-banned area
Fully close
ON
Fan
OFF
Output
∆D
∆0
ON
Force supply
(from the
outdoor unit)
OFF
Start
(4)
Making the fan rotate when
the flap passes over the
fan-banned area
Running
Start
Operation
starting control
The outdoor unit provides force
when it receives the ∆D signal.
Output of the ∆D signal after
(2)
the front panel starts moving
ON
Under running control
Under operation mode control
Under operation mode control
(R11910)
Function and Control
SiBE121135
(R14049)
: Actual position
of panel or flap
: Additional
control of motor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents