Assembling The Gear Pump Unit - Yamaha F115A Service Manual

Hide thumbs Also See for F115A:
Table of Contents

Advertisement

BRKT
TILT RAM ASSEMBLY AND GEAR PUMP UNIT
7350
7360
7370
7380

ASSEMBLING THE GEAR PUMP UNIT

CAUTION:
Install all components in their original
direction and position for proper assembly
and operation.
1. Install:
• Balls (3.18 mm/0.125 in) 1
• Shuttle valves 2
NOTE:
Apply grease to the balls to prevent them
from falling out of the gear pump.
2. Install:
• O-ring 1
• Ball (3.18 mm/0.125 in) 2
• Up-relief valve pin 3
• Spring 4
• Up-relief valve 5
• Up-relief valve assembly 6
3. Install:
• O-rings 1
• Check valves 2
• Balls (4.76 mm/0.187 in) 3
• Pump gears 4
4. Install:
• Gear pump 1
• Bolt 2
• Filter 3
• O-ring 4
• Down-relief valve 5
• Filter 6
NOTE:
Tighten the bolts evenly and make sure the
pump gears turn smoothly.
7-45
E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F115yFl115aLf115yFl115y

Table of Contents