Power Trim And Tilt Unit; Assembling The Gear Pump - Yamaha F200A Supplementary Service Manual

Hide thumbs Also See for F200A:
Table of Contents

Advertisement

Power trim and tilt unit

Assembling the gear pump

1. Install the drive gears 1, dowel pins 2,
balls 3, and shuttle pistons 4 into the
gear housing 1 5.
2. Install the gear housing 2 6.
3. Install the balls 7, manual release spring
8, and bracket 9 by installing the bolts
0, then tightening them to the specified
torque.
Gear pump bracket bolt 0:
7 N·m (0.7 kgf·m, 5.1 ft·lb)
4. Install the relief valve seal A and ball B
into the gear housing 1 5.
60L3D1X
Maintenance interval chart / Power trim and tilt unit
7
https://www.boat-manuals.com/
Up-relief lock screw a height
(from the top of the gear housing):
1.8–2.0 mm (0.071–0.079 in)
Down-relief lock screw b depth
(from the top of the gear housing):
1.5–2.0 mm (0.059–0.079 in)
5. Install the filters C and gear pump D by
installing the bolts E, then tightening
them to the specified torque.
6. Install the manual valve F.
Gear pump bolt E:
7 N·m (0.7 kgf·m, 5.1 ft·lb)
1
2
3
4
5
6
7
8
9
30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl200aF200aetFl200aet60l60m

Table of Contents