Steps For Finalizing The Installation - Travis Industries 564 HO NB GSR2 Installation Manual

(with screen)
Hide thumbs Also See for 564 HO NB GSR2:
Table of Contents

Advertisement

40

Steps for Finalizing the Installation

1.
Remove the glass.
NOTE: If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Make sure the accent light bulbs are in place.
NOTE: Take care to not touch the bulbs with your fingers (use a cloth or paper towel).
4.
Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the
household (AC) power goes out and are required for operation.
illustration below). Synchronize the transmitter to the IFC.
5.
Install the burner and media (and firebacks if applicable).
6.
Replace the glass.
7.
Start the heater.
8.
Leak test all gas joints.
Travis Industries
Installation
(
for qualified installers only)
Install three AAA batteries into the remote (see
4150330
40
100-01408

Advertisement

Table of Contents
loading

Table of Contents