Servo/Wire And Battery Installation - THUNDER TIGER Neptune SB-1 Instruction Manual

Submarine kit & sc
Table of Contents

Advertisement

4.5.6
SERVO/WIRE & BATTERY INSTALLATION
CONNECTING OF ELECTRONIC
UNIT & Battery
1
14
4
5
7
8
11
Battery
Fuse
Pressure Sensor
1
2
7
Power Distribution PCB
Leakage Detecting Wire
3
8
Charging Binding Post
Receiver
4
9
Water Pump
Servo Connecting Set
5
10
Water Pump Control PCB
Propulsion Motor
6
11
CONNECTING OF THE WIRES ON THE RECEIVER
Due to the difference radio system(Futaba, JR......) the wires have to be installed into the correct
channel ports on the receiver. All the wires have the difference colors, please refer the following wire
function table to do the installation.
Skymaster/
9
JR
CH 4
CH 1
CH 2
CH 3
2
B
3
6
12
Speed Controller
12
Servo (rudder & elevator)
13
Battery Connecting Wire
14
Speed Controller Wire
15
Camera Set(optional)
16
(
Power PCB)
3
A
Receiver
Sea
Color
Commander
/Futaba
CH 4
CH 2
CH 1
CH 3
16
A
15
9
10
13
(
Power
B
3
Distribution PCB)
Wires
Drive System Function
Wire From
Water Pump
Diving/
Power
Floating
Distribution
PCB
Speed
Forward/
Servo
Controller
Backward Connecting
(Propeller)
Set
Rudder
Turn Left/
Servo
Right
Elevator
Pitch Up/
Servo
Down
CONNECTING OF THE
SERVO CONNECTING SET
Speed Controller
10
Rudder
Servo
Elevator Servo
NOTE
1
3
BOX
BOX
BAG
F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5220-k5220-f

Table of Contents