Assembly Section - THUNDER TIGER Neptune SB-1 Instruction Manual

Submarine kit & sc
Table of Contents

Advertisement

ASSEMBLY SECTION

Most parts in the kit version are organized and packed in difference bags & Box. The packages are according to
the assembly step and all the bag/box No are shown on the outside of the package. Basically, the electronic are
package in Box1~Box4 and other parts are packaged in the Bag-A~ Bag-I. For all the screws, nuts, O-ring ...standard
parts are also packed in one bag. In each assembly step, the need standard parts and BAG are shown on the bottom
of each assembly icons. Do not open all the bags at once. Just open and prepare the right pats from the bag and
correct standard parts before each assembly step. Then follow the drawing/information are shown in each step to
execute the assembly process.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5220-k5220-f

Table of Contents