Tfsso Frame Installation; Logo Placement - Napoleon GSST8N Installation And Operating Instructions Manual

Natural gas propane
Table of Contents

Advertisement

5.5

TFSSO FRAME INSTALLATION

A.
Hang the frame onto the ¿ rebox by
engaging the top trim bracket into the
slot in the top of the frame and the
bottom hooks of the frame into the slot
in the mounting cabinet.
TRIM
BRACKET
B.
Install the trim bracket supplied in your
manual baggie to the ¿ rebox using 3
screws.
NOTE: If the frame needs to be secured, use
two screws in the holes provided behind the
control door.
Insert the door stop chain into the receiving slot
in the control door. Then insert the door chain
into the receiving slot in the frame so that when
fully opened the control door has a clearance of
1/8" to the mounting cabinet.
NOTE: In most cases a count of 15 balls on
the chain between receiving slots will be
suffi cient.
5.6

LOGO PLACEMENT

With the control door closed, af¿ x the logo to the front face of
the control door at the bottom left corner.
SLOT
FRAME
(REAR VIEW)
1/4"
(APPROX.)
LOGO
15
TRIM
BRACKET
DOOR
CHAIN
CONTROL
DOOR
1/4"
(APPROX.)
W415-0689 / C / 06.13.12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsst8p

Table of Contents