Finishing; Tmcss Mounting Cabinet Installation - Napoleon GSST8N Installation And Operating Instructions Manual

Natural gas propane
Table of Contents

Advertisement

5.0 FINISHING

5.1

TMCSS MOUNTING CABINET INSTALLATION

BEFORE STARTING THE INSTALLATION, REMOVE THE PROTECTIVE LAYER FROM ALL THREE
COMPONENTS THAT MAKE UP THE GSST8 (CABINET, FRAME AND TORCH).
NOTE: It is recommended that all fasteners be
stainless steel.
A.
Using the installation template (W122-0401)
supplied, determine the best mounting location
for your new Torch. (Refer to your manual for
clearances) Mark all 14 hole centres on the
wall (surface) using the template.
B.
Remove the template. Depending on the
surface and fasteners, drill the appropriate
holes. Hold the Torch up, aligning the
mounting brackets to the mounting holes.
Secure the Torch to the wall using the
appropriate fasteners. NOTE: The Torch has
been designed to have a 1/2" clearance
between the rear outer panel and the
mounting surface.
WARNING
!
1
CABINET
11
INSTALLATION
TEMPLATE
TORCH
MOUNTING
FRAME
2
MOUNTING
BRACKET
W415-0689 / C / 06.13.12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsst8p

Table of Contents