3. Attach the receiver dome to the housing
(continued).
b.
Twist the dome to the right (clockwise) until
it locks in place (approximately 1/8 turn). The
dot on the rim of the housing should now
align with the arrow on the dome locking tab.
4. Pull the cables to the PoleVault switcher.
a.
Remove the bottom covers of the PMK 560
projector mount.
b.
Pull the cables from the receiver and from
the speakers in VLS systems to the PoleVault
switcher location.
c.
Run the cables down through the projector
pole and the PMK mounting bracket.
VoiceLift System with PVS 405D Installation Guide • Installation — Stage 4
Dot on Housing
Arrow on Tab
The arrow aligns with the dot when the dome
Ý
is in place.
31