Finalizing work

02092014 - 7619497-02
2. Set the percentage CO
highest and the lowest setting limit, as determined after the full
load setting. (Front panel removed).
4
4
Part load CO
WARNING
There MUST remain a "gap" between the full load and part
load values. The full load value must be 0.4% higher than
the part load value.
3. Briefly press the RESET button to return the boiler to normal
operating status.
1. Remove the measuring equipment.
2. Put the flue gas sampling plug back in place.
3. Refit the front panel.
4. Raise the temperature in the heating system to approximately
70°C.
5. Shut down the boiler.
6. After about 10 minutes, vent the air in the heating system.
7. Switch on the boiler.
8. Check the tightness of the flue gases evacuation and air inlet
T001522-A
connections.
9. Checking the hydraulic pressure. If necessary, top up the water
level in the heating system (recommended hydraulic pressure
between 1 and 2 bar).
10.Tick the gas category used on the data plate.
11.Explain the operation of the installation, the boiler and the
regulator to the users.
12.Slide the User instruction card supplied into the guides underneath
the connection box.
13.Fill in Commissioning sheet, can be found in the appendix.
14.Give all the instruction manuals to the user.
for the gas type being used inside the
2
If the percentage CO
is too high, turn the screw B
2
anticlockwise for a lower percentage.
If the percentage CO
is too low, turn the screw B
2
clockwise for a higher percentage.
must be between 8.70 and 9.05 %.
2
6. Commissioning
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maineco combi 35Maineco system 18Maineco combi 28

Table of Contents