Checking And Maintenance; General Instructions; Standard Inspection And Maintenance Operations; Open The Boiler - Baxi MainEco Combi 24 Installation And Service Manual

Wall mounted gas condensing boiler
Hide thumbs Also See for MainEco Combi 24:
Table of Contents

Advertisement

Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24
8

Checking and maintenance

8.1

General instructions

8.2

Standard inspection and maintenance operations

1
02092014 - 7619497-02
4 Carry out the inspection and standard maintenance operations
once a year.
4 Carry out specific maintenance operations if necessary.
R000695-B
8.2.1.
1. Unscrew the 2 screws, located on the front panel.
1
R000346-A
WARNING
Maintenance operations must be done by a qualified
4
engineer.
An annual inspection is compulsory.
4
Only original spare parts must be used.
4
WARNING
Ensure that the boiler is switched off. Electrical isolation
can be checked at the electrical test point.
CAUTION
Always examine any seals or gaskets, replacing
4
where necessary. Where a seal or gasket is supplied
with a spare part it should be used, irrespective of the
condition of the original.
Use only original spare parts that are intended for use
4
with this type of boiler.

Open the boiler

8. Checking and maintenance
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maineco combi 35Maineco system 18Maineco combi 28

Table of Contents