For The Service Technician; Initial Start-Up And Operating Instructions; Service And Repair Work - Baxi Bioflo Installation & Servicing Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

For the Service Technician

4.1

Initial start-up and operating instructions

Windhager Customer Service or the customer service partner will start up the boiler first of all, and will famil-
iarize the customer with the system operation and cleaning of the boiler, with reference to the Operating Man-
ual.
The following preconditions must be met before you order the initial start-up:
1.) Boiler installed correctly.
2.) System fully wired up electrically.
3.) System rinsed, filled and vented – heat consumption must be possible.
4.) Boiler connected to domestic water and filled.
5.) Sufficient quantity of fuel available (pellets, split logs, oil or gas).
6.) The customer must be present during start-up.
The initial start-up cannot be carried out if any of these points is neglected. The customer will be charged for
any unnecessary costs arising as a result.
Start-up and maintenance are part of the guarantee requirements of the enclosed "guarantee limitations" .
Note: During the first few weeks after start-up, condensation can occur in the combustion chamber, ash pan
and on the heating surfaces. This has no effect on the function and service life of the boiler.
4.2

Service and repair work

Service and repair may be performed only by appropriately qualified technicians.
Always disconnect the mains power plug for service or repair purposes.
After being switch off, the boiler and accessories are not completely without power! When replacing system
components (pumps, mixing valves, etc.) prevent all power input by removing the mains power plug.
Remove the right side panel: Unhook the rear side panel, disconnect the mains power plug, remove the secur-
ing screw under the mains power plug (Fig. 51) and swivel open the control panel.
Remove the left side panel: Remove the securing screw at the rear on the left side panel (Fig. 52) and unhook
the side panel.
Mains power plug
(230 VAC)
Fig. 51
Disconnecting the mains power
plug and removing the screw.
Fig. 52
Removing the securing screw
36