Baxi MainEco Combi 24 Installation And Service Manual page 23

Wall mounted gas condensing boiler
Hide thumbs Also See for MainEco Combi 24:
Table of Contents

Advertisement

Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24
Z
1
2
0
OZ
B
60
02092014 - 7619497-02
3
240
T000756-A
When choosing the position for mounting the boiler, bear
in mind the authorised position of the combustion gas
discharge outlets and the air intake opening.
¼For more information, see chapter: "Connections for
the air and exhaust pipes", page 29.
)For more detailed information, see: Flue Accessories
& Fitting Guide.
WARNING
Fix the appliance to a solid wall capable of bearing
4
the weight of the appliance when full of water and fully
equipped.
Do not place the appliance above a heat source or a
4
cooking appliance.
Do not locate the boiler in direct sunlight.
4
It is forbidden to store inflammable products and
4
materials in the boiler room or close to the boiler,
even temporarily.
CAUTION
The boiler must be installed in a frost-free
4
environment.
An earthed electrical connection must be available
4
close to the boiler.
A connection to the mains drainage system for the
4
discharge of condensate must be available close to
the boiler.
n Safety rating
Zones
Z
Breakdown of the exterior zone
OZ
Bathtub or shower tray
B
For safety rating IP X4D, installation in the bathroom is possible in
zones 2 and 3 and in the breakdown of the exterior zone.
In this case, connect the 230 V power supply as a fixed connection
to a fused spur.
CAUTION
In the case of a fixed connection to the power cord, you
must always install a main bipolar switch with an opening
gap of at least 3 mm (EN 60335-1).
5. Installation
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maineco combi 35Maineco system 18Maineco combi 28

Table of Contents