KVH Industries TracVision G6 Technical Manual page 22

Satellite tv system
Hide thumbs Also See for TracVision G6:
Table of Contents

Advertisement

9. Clean the mounting surface where the foam seal
will be placed. Remove the paper backing from the
foam seal to expose the contact cement, then lay
the foam seal in place, adhesive side down, and
press down firmly to bring the adhesive into full
contact along the bottom.
10. Connect the data, power, and RF cables from
belowdecks to the baseplate as shown in
Figure 2-6. Turn the power and data cable
connectors down until locked in place; don't use
excessive force. Connect the RF cable(s) with a
wrench, applying 30 pounds of torque. If you
connect more than one RF cable, label both ends of
each RF cable to match its antenna baseplate
connector (RF1, RF2, RF3, or RF4).
Power
Single IRD
Installation
11. Place the antenna baseplate over the holes drilled
in the foundation, ensuring the "Forward" label
(shown in Figure 2-4) points toward the bow.
54-0161
Used only with
Quad-output LNB
Data
Second IRD
Installation
7
"
1 6
Figure 2-6
Baseplate Connector Assignments
(Bottom View)
Do NOT use teflon gel on the cable
fittings as it reduces signal strength
at higher frequencies.
Installation
17

Advertisement

Table of Contents
loading

Table of Contents