Piston (Traction) Pump Flow Test - Toro Reelmaster 5210 Service Manual

Hide thumbs Also See for Reelmaster 5210:
Table of Contents

Advertisement

Piston (Traction) Pump Flow Test (Using Tester with Flow Meter and Pressure Gauge)
TO MOW CONTROL
(FRONT CUTTING UNITS)
TO MOW CONTROL
(REAR CUTTING UNITS)
INTERNAL
CASE
DRAIN
P5
Procedure for Piston (Traction) Pump Flow Test
This test measures piston (traction) pump output (flow).
During this test, pump load is created at the flow meter
using the adjustable load valve on the tester.
IMPORTANT: Traction circuit flow for your Reel-
master is approximately 30 GPM (113.5 LPM). Use 40
GPM Hydraulic Tester #AT40002 (pressure and flow)
for this test (see Special Tools in this chapter).
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine under load for
approximately ten (10) minutes. Make sure the hydrau-
lic tank is full.
Hydraulic System (Rev. C)
TO STEERING CONTROL VALVE AND CHARGE CIRCUIT
P1
P2
P3
P4
100 MESH
SUCTION
STRAINER
R3
R4
R5
R9
FROM STEERING CONTROL VALVE
TO LIFT CONTROL MANIFOLD
EXTERNAL CASE DRAIN (TO RESERVOIR)
TESTER
A
B
Figure 35
2. Park machine on a level surface with the cutting units
lowered and off. Shut off engine. Make sure mow speed
limiter is in the transport position to allow full movement
of traction pedal.
3. Read Precautions For Hydraulic Testing in this sec-
tion.
Before opening hydraulic system, operate all hy-
draulic controls to relieve system pressure and
avoid injury from pressurized hydraulic oil. See
Relieving Hydraulic System Pressure in the Gen-
eral Information section of this chapter.
Page 4 - - 38
G5
FORWARD
A
TRACTION
LH
M7
WHEEL
M6
MOTORS
B
G6
CAUTION
Reelmaster 5010 Series
A
RH
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 5410Reelmaster 5510Reelmaster 5610

Table of Contents