REMOVAL AND REPLACEMENT PROCEDURE (continued)
FIGURE F.28 – 115 VOLT SUPPLY BOARD LEAD LOCATIONS
J82
J82
LED 1
J81
J81
REPLACEMENT PROCEDURE
1. Place the new 115 Volt Supply Board onto the
mounting studs.
2. Using a 3/8" nutdriver, attach the four nuts
securing the 115 Volt Supply Board to the front
divider panel.
3. Attach plugs J82 and J83 to the 115 Volt Supply
Board. See Wiring Diagram.
4. Attach the leads previously removed to tab ter-
minals B5 and B6. See Wiring Diagram.
5. Replace any cable ties that may have been
removed.
6. Perform the Case Cover Replacement
Procedure.
TROUBLESHOOTING AND REPAIR
115 VOLT SUPPLY BOARD
LED 3
LED 2
B5
B5
POWER WAVE
J83
J83
B6
B6
®
S500
F-73
NUTS
(4 PLACES)