Operation Sequence - Kohler 4EOZ Service

Marine generator sets
Hide thumbs Also See for 4EOZ:
Table of Contents

Advertisement

8.3 Operation Sequence

Use the following controller operation sequence to help
localize and control possible inconveniences. Follow
the wiring diagram sequence shown in Section 10. If a
By the operator.
The relay (K1) is energized.
The starter motor solenoid (S) is
energized.
The electric fuel pump (FP) is
energized.
AC is supplied for the load and
for the static exiting circuit.
AC energizes the relay (K3) that
disconnects the starter.
The relay (K1) is deenergized.
Release the START switch. The
generator set is operating
because the relay (K2) is
energized by the control panel.
Figure 8-4 Starting Operation
TP-6137 5/03
repair is needed, be sure to disconnect the battery.
Consult the safety precautions in the beginning of this
manual.
3.5EFOZ/4EOZ Kohler generator
starting operation.
Push the ON/OFF switch.
The panel control energizes.
Push the START switch.
By the separate control.
The relay (K2) is energized.
The battery charging voltage
regulator (VR) is excited.
The stop solenoid (FS) is energized
and opens. Fuel flows to the pump.
The unit operates.
The engine alternator charges
the battery.
The engine speed opens the low
oil pressure switch (LOP)
contacts and avoids stopping the
engine.
The unit operates because the
High Cylinder Head Temperature
(HCHT) and High Exhaust
Temperature (HET) contacts that
are normally opened, are still
opened together with the low oil
pressure switch (LOP) contacts.
Section 8 Controller Troubleshooting
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3.5efoz

Table of Contents