Installation Procedure - Rinnai PRESTIGE Operation & Installation Manual

Solar split systems
Table of Contents

Advertisement

INSTALLATION & MAINTENANCE - ELECTRIC BOOSTED SYSTEMS

INSTALLATION PROCEDURE

1. Install Solar Collectors
Position and install the solar collectors in accordance with the section 'INSTALLATION OF SOLAR
COLLECTORS'.
2. Position Storage Cylinder
Position the hot water storage cylinder on a level base in accordance with the section "STORAGE
CYLINDER LOCATION"
3. Connect PTR Valve
Connect the PTR Valve in the location shown in the relevant diagram of Figures 40 to 41.
Leave the valve outlet pointing down. Tighten the valve using the spanner flats - never use the
valve body.
The PTR Valve must be adequate for the thermal loading applied to the storage cylinder. In the
case of gas boosted systems, the thermal load is applied only by the solar collectors. The
continuous flow hot water heater does not apply thermal load to the storage cylinder. The
potential solar output for the solar collectors at PTR Valve relief conditions is listed in Table 3.
The PTR Valve pressure ratings vary according the cylinder specifications. The maximum heater
input rating is 10.0 kW. The PTR valve rating MUST EXCEED the total input from the solar
collectors. If it does not, the PTR valve MUST be exchanged for a model of higher capacity.
For example, for a gas boosted solar system with 3 x SP200A collectors, the thermal load is 3 x
1.25 = 3.75 kW. This is less than 10.0 kW, hence the supplied PTR valve is of sufficient capacity.
Use Teflon thread tape on the valve, never use hemp or other sealing materials. Ensure the tape
does not protrude past the end of the thread, which could result in it hanging over the end of the
thread and blocking the water passage through the valve.
4. Connect Fittings and Mount Pump Assembly
Connect fittings and pipe work as shown in the relevant diagram in Figures 40 to 41. Remove
cover of pump box and attach pump box to cylinder using screws provided. Do not connect the
power lead to power supply at this stage.
5. Set Frost Protection Mode
Adjust Dip Switches on solar controller to give the required frost protection.
6. Install and Connect Flow and Return Pipe Work
Connect flow and return pipe work between storage cylinder and solar collector. Ensure that
suitable pipe and insulation is used as described in the section "WATER PIPES".
7. Connect Temperature Sensor Leads
The hot (longer) temperature sensor lead should be fitted into the air bleed / hot sensor lead
assembly at the collector hot return connection as shown in Figure 40 to 41. It must be sealed in
place with thermoplastic putty or silicone.
Run the lead down the solar return pipe and connect it to
the connection within the pump and controller assembly
as shown in the diagram below. Ensure the lead is
protected from light.
The cold (shorter) temperature sensor lead should be
fitted as shown in the relevant diagram in Figures 40 to
41. Ensure the lead is protected from sunlight. It must be
sealed in place with thermoplastic putty or silicone. The
plug is then connected to the pump and controller
assembly as shown in the diagram.
Replace pump assembly cover.
Rinnai Australia
hot sensor connection
in pump box.
hot sensor lead
connection
Figure 3 - Temperature Sensor Leads
- 54 -
Solar Split Systems Operating / Installation Manual Version 8 - 18/10/10
cold sensor connection
in pump box.
cold sensor lead
connection